FreeState Electric Cooperative provides and installs a meter base for our members seeking new service. The meter base provided will either be a meter loop installed on a pole or a meter pedestal for locations served from a pad-mounted transformer. FreeState will install, own, and maintain this meter base.
The type of meter installation and location will be determined and agreed upon during a new construction meeting held between a FreeState Representative and the member seeking new service. The location will be determined by maintaining a recommended distance of 150’ of total combined secondary/service conductor from the transformer location to the service entrance of the primary structure in need of service.
The cost of installing the meter base will be included in the overall construction cost presented to the member.
Any wire or service components installed past the metering location will be the responsibility of the member. This will include but not be limited to all trenching, conduit, conductors, and connect from the metering location.
New Construction Application
Complete the form below and return to FreeState:
Mail to East District
FreeState Electric Cooperative
Attn: Amanda Tarwater
PO Box 70
McLouth, KS 66054
Mail to West District
FreeState Electric Cooperative
Attn: Corey Calvert
1100 SW Auburn Rd.
Topeka, KS 66615
or submit the form via email.
FreeState New Build Process
Verification Process
The new build process starts with a simple phone call to our office. A member account coordinator (MAC) will work with you through the entire process. The MAC will be a point of contact for the process, will verify your address and assist in getting your information.
A $250 application fee is due with a new construction application. A site visit will not be scheduled until the fee is paid in full.
The new build application process will be guided by a FreeState member account coordinator. Please keep in mind that process time for applications can take 2 to 3 business days, and it may take longer to be invoiced for payment.
The MAC team will assist you in any way they can, but during the busiest seasons, it could take longer to process your information.
To help expedite the process, please feel free to download and fill out the new build application. You can bring it into the office with you or email it.